Poland
Expressway in Kamienna Gora, Poland
Stormwater Treatment Systems
As a part of S3 Legnica (A4) – Lubawka road design and construction project in Poland, during the autumn of 2021, we supplied various sludge traps and light liquids separators. The biggest sludge trap was 60 000 l and the biggest light liquids separator was 500 l/s.