# Expressway in Kamienna Gora, Poland

As a part of S3 Legnica (A4) – Lubawka road design and construction project in Poland, during the autumn of 2021, we supplied various sludge traps and light liquids separators. The biggest sludge trap was 60 000 l and the biggest light liquids separator was 500 l/s.

[Project basic information (GGDKiA)](https://s3-kamiennagora-granicapanstwa.pl/)
